Post by Engr. Olusola Adedayo (@Moschino)
The Nigerian Electricity Regulatory Commission (NERC) has directed private transmission substations connected to the national grid to obtain an independent electricity transmission network operator (IETNO) permit within 45 days.

0 likes · 0 comments · 0 shares